Projects in the Philippines benefit from keeping the configuration, branch identification and installation requirement consistent across every participating site. This hybrid simplex armored patch cable puts an LC UPC connector on one end and an SC APC connector on the other, joined by a single OS2 9/125µm fiber inside a helical stainless steel tube and blue 3.0mm riser-rated (OFCR) jacket. It is built for the common access-network case where the active equipment speaks LC but the optical distribution network presents an angled SC interface. Project teams in the Philippines can carry this requirement into the site documentation used by each contractor.
| Connector Type | LC to SC |
|---|---|
| Polish Type | UPC to APC |
| Fiber Mode | OS2 9/125µm |
| Wavelength | 1310/1550nm |
| Fiber Count | Simplex |
| Fiber Grade | G.657.A1 (Compatible with G.652.D) |
| Min. Bend Radius (Fiber Cable) | 10/5D (Dynamic/Static) |
| Cable Outside Diameter (OD) | 3.0mm |
| Flame Rating | Riser (OFCR) |
| Construction Type | Single Armored, Stainless Steel Tube |
| Tensile Strength | 120/225N (Long/Short Term) |
| Insertion Loss | ≤0.3dB |
| Return Loss | ≥50dB (UPC) / ≥60dB (APC) |
| Operating Temperature | -20 to 70°C (-4 to 158°F) |
| Storage Temperature | -40 to 70°C (-40 to 158°F) |
FTTx and access deployments constantly bridge two interface worlds: the OLT, media converter or test set with LC ports on one side, and the distribution frame or wall outlet terminated with SC APC on the other. A hybrid cord makes that transition in one tested item instead of stacking an adapter onto a standard jumper, removing a mated pair and its loss from the optical path.
The UPC end is flat-polished for the hardware side; the APC end is ground at 8 degrees to mate with the angled plant. UPC and APC connectors must never be mated to each other: the angled and flat end faces meet at a gap that destroys return loss and may chip the fiber. This cord is built so each end meets only the interface it was polished for.
Hybrid access tails run through the least controlled part of the network: customer wall boxes, cabinet doors, basement risers and pole-top enclosures. The helical steel tube inside the jacket gives the cord crush and rodent resistance exactly where the fixed plant may no longer protect it, without sleeving the run in conduit.
The common three: connecting LC-port OLT or test equipment to an SC APC distribution frame, jumpering between an ONT with LC pigtail access and the APC wall outlet, and lab setups where LC-based instruments must exercise APC plant. In all three the hybrid cord replaces an adapter-plus-jumper stack, removing one mated pair from the optical path and one source of intermittent loss from the trouble report.
Standard size options are stocked for fast delivery: 1m (3ft), 2m (7ft), 3m (10ft), 5m (16ft), 10m (33ft), 15m (49ft), 20m (66ft) and 30m (98ft), covering the common rack-to-rack, access and frame connections this cord is built for. Non-standard lengths beyond this range are manufactured to order. For access tails, measure from the hardware port to the frame mounting point and order to that figure; the cord then dresses without a service loop trapped behind the enclosure. Specifying the particular channel length avoids both the slack storage problem of an overlong cord and the strain risk of one that is too short.
Every hybrid item is terminated with precision zirconia ferrules, with the APC end angle-verified and both cable ends geometry-checked. Insertion loss and return loss are measured through the finished cord before packing; as a result, the 0.3dB insertion ceiling and the 50/60dB return figures describe the delivered item, not a lab sample.
Refer to the LC UPC to SC APC simplex armored product line when submitting a request for a quotation, and state the channel length and jacket rating. If the plant uses a separate connector mix, the customized simplex armored program builds any combination once the factory confirms the specification. Customers in the Philippines can include multi-site labeling or documentation requirements when requesting a project quotation.